21.06.2022
Ævia: shifting of two railway bridge structures in Savoie
In the Savoie region, in the town of Viviers-du-Lac, our Ævia teams carried out the shifting of two railway bridge structures. Thanks to our experience and know-how in this field, we carried out an emergency intervention during a rail traffic shutdown.
As part of an operation to secure a level crossing, and after the preparatory work and earthworks, we intervened over a long weekend to slide a 160 tons pedestrian structure over 26 meters for 2 hours and a 1,000 tons road structure over 30 meters in 7 hours, to their final location.
Our territorial coverage allows us to intervene in both large-scale and one-off operations.
Congratulations to the teams for their work.
www.eiffage-aevia.com
-
25.04.2024Eiffage Civil Engineering has excavated the first 3...The first 3 kilometers of tunnel for Lot 2 have been excavated as part of the construction of the future VL8 collector! The tunnel boring machine, named Béatrice,...
-
24.04.2024
-
19.04.2024The Foundations teams at Eiffage Civil Engineering...For this expansion project, carried out for the Luberon Shopping Center, the works include: