[Be vigilant] Increase in attempts to impersonate Eiffage and its subsidiaries (use of fake email addresses, fraudulent websites, etc.). More details here.

Eiffage Group's projects & achievements

Eiffage aims at excellence in all its projects. From design though construction to operation, all Eiffage teams share the Group’s trademark qualities covering an exceptionally wide range of expertise which makes all the difference.

Discover the achievements of Eiffage

    • LaVallée ecodistrict in Châtenay-Malabry

      With the “laboratory” ecodistrict project in Châtenay-Malabry, Eiffage is further solidifying its role as a demonstrator of sustainable cities. The aim of the project is to create an ecodistrict based on four fundamentals: low-carbon construction, the circular economy, nature integration, and new uses.

    • Hyper tower: industrial demonstrator for the sustainable city

      A wooden tower? In 2016, Eiffage Immobilier won the contract to build a first worldwide

    • Photovoltaic plant Núñez de Balboa

      The facility was built by Eiffage Energía’s teams and is set to generate 832 GWh in electricity every year – covering the needs of 250,000 local inhabitants and avoiding 215,000 tonnes of CO2 emissions per annum.

    • Hochmosel Bridge

      The Hochmosel bridge is one of the biggest steel viaducts constructed in Germany.

    • Bretagne-Pays de la Loire high-speed line

      Inaugurated on 1 July 2017, the Bretagne-Pays de la Loire high-speed line (LGV-BPL in French), an extension of the Paris-Le Mans line launched in 1989, is the biggest project ever completed by Eiffage.

    • Autoroute de l’Avenir

      Autoroute de l’Avenir (the Motorway of the Future) is the first PPP (public-private partnership) in sub-Saharan Africa, the first link in the Dakar-Diamniadio motorway, and the first toll motorway in West Africa.