19.12.2019
Eiffage Rail at Clamart station
Teams from Eiffage Rail, Eiffage Rail Caténaires and ERS renewed the tracks and ballast on the Paris-Brest line used by RER C at Clamart station.
Around a hundred employees were mobilised on this project to replace a wooden switch point with a concrete model, as well as a switch crossing and 530 metres of track.
Some fifty welds were necessary to carry out this operation ordered by SNCF Réseau.
Photos Credit: Eiffage Rail
-
17.04.2024Caïus 2024: Eiffage wins two awardsDaniel Buren's artwork "Like colors fallen from the sky, in situ and in motion," temporarily exhibited at the Liège train station in Belgium and supported by Eiffage,...
-
08.04.2024Eiffage Énergie Systèmes helps modernize a new SEI...SNCF Réseau has commissioned Hitachi Rail STS France and Eiffage Énergie Systèmes to digitize and connect the P22 and P23 signal boxes at Villeneuve-Saint-Georges,...
-
29.03.2024Grand Paris Express Security Label 2024: Double Recognition...Eiffage was honored twice with the Grand Paris Express Security Label 2024 for its construction sites, during the Grand Paris Express Security Label 2024 award ceremony...