18.04.2024
In Monaco, Eiffage Metal orchestrates the airlifting of masts onto the "Mareterra" real estate complex.
After several months of design by our engineering and manufacturing services, we are pleased to announce the installation of two masts, 28 and 38 meters high, at the top of this complex.
To accomplish this, our teams first assembled the masts on the Rainier III quay, and then a "Super Puma" from SAF company airlifted the structures, weighing respectively 1.4 and 2.3 tons, to the roof of the residence.
Rope access technicians from MTH company then took over to detach the attachments located at 17 and 27 meters along the masts.
Congratulations to our teams mobilized on this extraordinary project!
This project demonstrates the technical expertise of our teams and our capacity to innovate in order to make exceptional projects, such as "Mareterra," a reality and to shape a future where sustainable design goes hand in hand with elegance.
Watch the images of this large-scale operation!
-
24.06.2026Eiffage Métal at the heart of a plant modernization...A comprehensive intervention in a modernization project for the agri-food industry, aimed at improving energy performance. -
18.06.2026Eiffage, member of the NSORe joint venture, wins the...Eiffage, through its Belgian subsidiary Smulders, created NSORe (Neptun Smulders Offshore Renewables) with Neptun Werft, part of the Meyer Werft group. NSORe is... -
04.06.2026Eiffage wins as part of a consortium the contract to...Eiffage, through its German subsidiaries Eiffage Infra-Bau and SEH, has won in a consortium with Mostostal Kraków, the contract from the city of Nuremberg in Germany,...