As part of the modernization works at our client Cristal Union's facilities in Fontaine-le-Dun (76), our teams are providing their expertise in the design, prefabrication, and assembly of a major industrial piping network.
Our scope of work covers several distinct technical packages:
- "Evaporation" Package: Design, prefabrication, and assembly of a piping network totaling 45,000 inch-diameters, 810 valves, 900 supports, and the installation of associated equipment.
- "Air Coolers" Package: A similar mission for a network of 3,400 inch-diameters, 50 valves, the installation of pumps, and the fabrication of a condenser tank.
Associated Works: The dismantling of existing installations and the complete thermal insulation of the new lines.
A technical and comprehensive intervention that illustrates our commitment to supporting the transformation of our industrial clients. Congratulations to the teams for this project, which will be delivered in July 2026!
Project Manager: IPSB
Client: Cristal Union
Credit: Eiffage
-
18.06.2026Eiffage, member of the NSORe joint venture, wins the...Eiffage, through its Belgian subsidiary Smulders, created NSORe (Neptun Smulders Offshore Renewables) with Neptun Werft, part of the Meyer Werft group. NSORe is... -
04.06.2026Eiffage wins as part of a consortium the contract to...Eiffage, through its German subsidiaries Eiffage Infra-Bau and SEH, has won in a consortium with Mostostal Kraków, the contract from the city of Nuremberg in Germany,... -
28.05.2026Eiffage and Arabelle Solutions sign a partnership agreement...Eiffage, through its subsidiary Eiffage Métal, and Arabelle Solutions, a subsidiary of EDF, signed a 12-year partnership agreement for the manufacturing of modules...