As part of the modernization works at our client Cristal Union's facilities in Fontaine-le-Dun (76), our teams are providing their expertise in the design, prefabrication, and assembly of a major industrial piping network.
Our scope of work covers several distinct technical packages:
- "Evaporation" Package: Design, prefabrication, and assembly of a piping network totaling 45,000 inch-diameters, 810 valves, 900 supports, and the installation of associated equipment.
- "Air Coolers" Package: A similar mission for a network of 3,400 inch-diameters, 50 valves, the installation of pumps, and the fabrication of a condenser tank.
Associated Works: The dismantling of existing installations and the complete thermal insulation of the new lines.
A technical and comprehensive intervention that illustrates our commitment to supporting the transformation of our industrial clients. Congratulations to the teams for this project, which will be delivered in July 2026!
Project Manager: IPSB
Client: Cristal Union
Credit: Eiffage
-
17.09.2026Eiffage wins a second contract, as part of the NSORe...Eiffage, through its Belgian subsidiary Smulders, as a member of the NSORe joint venture (Neptun Smulders Offshore Renewables) has been awarded by 50Hertz (the transmission... -
17.09.2026Eiffage Métal is assembling the future Colombelles...Our Eiffage Métal teams are taking part in the replacement of the Colombelles bridge, a strategic structure on the canal from Caen to the sea, for our client Ports... -
03.09.2026