11.10.2018
Eiffage to build Chirajara cable-stayed bridge in Colombia
Eiffage Génie Civil and the group's Colombian subsidiary Puentes y Torones have been chosen by Colombian motorway concession company Coviandes to design and build a cable-stayed bridge at Chirajara, a hundred kilometres from Bogotá in Colombia.
This 446 m structure supported on two V-shaped piers boasts a main 286 m span and will rise to a height of 150 m above the ravine. The bridge will be part of a programme to modernize « Los Llanos » motorway linking Bogotá and Villavicencio, and should reduce travelling time between these two towns by 25 minutes. The project involves 4 months' preliminary studies and 18.5 months' work, for an 18.5 million euro-budget.
Photos Credit: Eiffage Génie Civil
-
16.06.2026In Marseille: 20 hours to deconstruct the Bourrely...At the end of April, our Demcy teams managed a major project for the Aix-Marseille-Provence Metropolis: the deconstruction of the Bourrely bridge, which spanned... -
12.06.2026Inauguration of the new site facilities for the EPR2...The project's site facilities were inaugurated yesterday by Xavier Mony and Christophe Sandré, in the presence of Audrey Baconnais-Rosez, Sub-prefect of Dieppe;... -
09.06.2026Toulouse metro: tunnel boring machine Lise Enjalbert...Our tunnel boring machine, Lise Enjalbert, and its team have achieved a crucial milestone with the second breakthrough at the future Blagnac station.