23.08.2022
Salpêtrière bridge : Eiffage Métal carried out the second jacking
Discover the images of the second launching of the framework of the Salpêtrière bridge linking the Pitié Salpêtrière hospital to the avenue Pierre Mendès France by flying over the tracks of the Austerlitz station in Paris.
With a total length of 82 m and a width varying from 19 to 32 m, this structure weighs more than 2,000 tonnes and constitutes a new pedestrian, cycling and road link.
Congratulations to our teams for their work, especially those in Lauterbourg !
MOA : Semapa
MOE : Arcadis, WilkinsonEyre
Group of companies : Eiffage Métal, Razel-Bec, Fayat Fondations
to discover also
-
17.09.2026Eiffage wins a second contract, as part of the NSORe...Eiffage, through its Belgian subsidiary Smulders, as a member of the NSORe joint venture (Neptun Smulders Offshore Renewables) has been awarded by 50Hertz (the transmission... -
17.09.2026Eiffage Métal is assembling the future Colombelles...Our Eiffage Métal teams are taking part in the replacement of the Colombelles bridge, a strategic structure on the canal from Caen to the sea, for our client Ports... -
03.09.2026