10.07.2023
In Benin, Eiffage Génie Civil continues work on extending the port of Cotonou
An update on the Cotonou port extension project with our Eiffage Génie Civil Marine teams.
- Delivery of major equipment such as the EGCM001 barge and 180 t and 300 t crawler cranes
- Installation of the two EI Mobile Equipment concrete plants from Eiffage Infraestructuras to produce all the concrete for the project
- Continuation of design studies with our engineering teams
Well done to the teams involved in preparing this site!
to discover also
-
16.06.2026In Marseille: 20 hours to deconstruct the Bourrely...At the end of April, our Demcy teams managed a major project for the Aix-Marseille-Provence Metropolis: the deconstruction of the Bourrely bridge, which spanned... -
12.06.2026Inauguration of the new site facilities for the EPR2...The project's site facilities were inaugurated yesterday by Xavier Mony and Christophe Sandré, in the presence of Audrey Baconnais-Rosez, Sub-prefect of Dieppe;... -
09.06.2026Toulouse metro: tunnel boring machine Lise Enjalbert...Our tunnel boring machine, Lise Enjalbert, and its team have achieved a crucial milestone with the second breakthrough at the future Blagnac station.