The contract includes mechanical, hydraulic and electrical maintenance work for a period of 4 years. Operations can range from the simplest to the heaviest, such as dismantling equipment for overhaul.
The teams will also ensure the permanent operation of the bridge.
Built in 2008 as a consortium by Eiffage Métal and Eiffage Génie Civil, the Gustave-Flaubert bridge is the largest mobile bridge in Europe. Considered one of the symbols of the city of Rouen, it is distinguished by its revolutionary design with its two aprons suspended from pylons that carry the "butterfly" lifting mechanisms 55 m above the Seine.
This prestigious project once again confirms the expertise of Eiffage Métal's Industrial Division.
Photo credits: Eiffage Métal
-
25.04.2024Eiffage Civil Engineering has excavated the first 3...The first 3 kilometers of tunnel for Lot 2 have been excavated as part of the construction of the future VL8 collector! The tunnel boring machine, named Béatrice,...
-
24.04.2024
-
19.04.2024The Foundations teams at Eiffage Civil Engineering...For this expansion project, carried out for the Luberon Shopping Center, the works include: