29.10.2019
Ivory Coast: construction work begins on the Singrobo-Ahouaty dam
The first works began on Tuesday, October 22nd for the creation of the future access road to the Singrobo-Ahouaty dam in the presence of our client Ivoire Hydro Energy, the prefectoral authorities, and all the impatient and enthusiastic village chiefs.
This project, located on the Bandama River between Abidjan and Yamoussoukro, involves the expertise of Eiffage Génie Civil and Eiffage Énergie Systèmes.
The contract, worth €110 million, covers the turnkey design and build of this hydropower project, including civil engineering and all the hydromechanical, electromechanical and electrical equipments for this 44 MW plant.
Delivery planned for 2023.
Photos Credit: Eiffage Génie Civil
-
25.04.2024Eiffage Civil Engineering has excavated the first 3...The first 3 kilometers of tunnel for Lot 2 have been excavated as part of the construction of the future VL8 collector! The tunnel boring machine, named Béatrice,...
-
24.04.2024
-
19.04.2024The Foundations teams at Eiffage Civil Engineering...For this expansion project, carried out for the Luberon Shopping Center, the works include: