11.12.2019
Guyana: Eiffage Métal replaces the Larivot footbridge
Since March 2019, the Agglomeration Community of Centre Littoral (CACL) has mandated Eiffage Métal's Guyana entity to replace the Larivot footbridge and its support consoles.
Supported by the Vélizy design office and the Le Havre agency, the teams carried out the work, which also included the replacement of the water pipe over the Cayenne River, in a consortium with DLE Outre-Mer, in particular.
The assembly and installation work, comprising 400 t of steel for the 34 supports and 35 sections of 33 m each, involved around 15 employees day and night for 3 months, as well as specific equipment:
Nautical equipment:
- 1 pusher boat
- 1 floating pontoon of 50 m²
- 1 spider basket
-Land equipment:
- 2 bogies to pull the gangways
- 2 crane trucks
- 3 telescopic trolleys
This network will secure drinking water access for 46,000 households in the coming weeks.
Photos Credit: Eiffage Métal
-
18.04.2024In Monaco, Eiffage Metal orchestrates the airlifting...After several months of design by our engineering and manufacturing services, we are pleased to announce the installation of two masts, 28 and 38 meters high, at...
-
27.03.2024The students from the Builders engineering school in...Paul Queric, project engineer at Eiffage Métal, shared his experience with the students of Builders - Engineering School, regarding this large-scale project.
-
06.03.2024CNES testifies on the construction of the Ariane 6...In this video, Pierre Guilhem from CNES explains how Eiffage Métal designed and built the Ariane 6 mobile gantry, enabling CNES to meet its target of twelve launches...